Anagama Kiln Firing Registration 12/27/2024- 1/2/2025
Anagama Kiln Firing Registration 12/27/2024- 1/2/2025
Please see flyer for full details.
Fees:
Option 1: $30/cubic foot
Requirements:
Splitting a minimum of one hour. Additional cubic feet requires 15 minutes per cubic foot.
One shift (8 hours) stoking crew.
All work going into the kiln must be wadded, wadding will be provided.
Present to help grind, wash, stack shelves and/or bricks after unload.
All work needs to be dropped off and ready on first day of loading.
Option 2: $50/cubic foot
Requirements:
NO wood splitting.
One shift (8 hours) stoking crew.
All work going into the kiln must be wadded, wadding will be provided.
Present to help grind, wash, stack shelves and/or bricks after unload.
All work needs to be dropped off and ready on first day of loading.
Option 3: $80/Cubic Foot
Requirements:
NO wood splitting
NO stoking shift
NO shelf grinding, washing shelves, stacking shelves and/or
bricks required.All work going into the kiln must be wadded, wadding will be provided
All work needs to be dropped off and ready by noon on first day of loading
Paying this fee serves as the reservation for your spot in the firing and is refundable minus a 20% processing fee.